Case Studies

  • Frontline Trays & Trailers

    Frontline Trays & Trailers

    See how Frontline Trailers used WorkGuru to quote faster, cost jobs accurately, and renegotiate contracts with confidence.

  • LVX Global

    LVX Global

    WorkGuru keeps LVX running sharp. It connects seamlessly with Xero, streamlining quoting, purchasing, and invoicing without the extra admin. Simple permission controls mean the right people see the right data, and switching between two businesses (LVX and FireM) is effortless. The result — faster responses, smoother workflows, and the agility the business needs to keep…

  • CPM Engineering

    CPM Engineering

    Discover how CPM Engineering, one of Queensland’s leading metal fabrication and manufacturing facilities, improved visibility, communication, and their systems by adopting WorkGuru.

  • Controlworx

    Controlworx

    Controlworx ditched spreadsheets and gained real-time visibility, faster quoting, and better stock control with WorkGuru—freeing up time to grow.

  • Weldingmen

    Weldingmen

    Weldingmen cut quoting time by 50% and finally gained control over stock, job tracking, and payroll—all with one system built for fabricators.

  • Arcwell Engineering

    Arcwell Engineering

    Arcwell struggled with slow payroll, manual admin work, and job cost tracking issues. With WorkGuru and Business Sense, they cut 15 hours of admin time weekly and streamlined operations. Learn more about their success story.

  • Watershed Group NZ

    Watershed Group NZ

    Watershed Group NZ transformed their operations with WorkGuru, streamlining workflows, speeding up invoicing, and empowering their team with flexible tools and real-time insights.

  • Top Gear Rotorua

    Top Gear Rotorua

    WorkGuru helped Top Gear Rotorua streamline their workflows, fix reporting headaches, and give the team tools to work smarter every day. With everything in one place and help always at hand, getting things done has never been easier.

  • MJK Industries

    MJK Industries

    MJK Industries revolutionised its project management with WorkGuru, enhancing data centralisation, financial tracking, and operational efficiency, setting a new standard in the engineering industry.

  • Hyserve Hydraulics & Controls

    Hyserve Hydraulics & Controls

    After adopting WorkGuru in August 2023, Hyserve has saved 60 monthly hours on timesheet entry and significantly improved its bottom line. WorkGuru’s real-time tracking and Xero integration have revolutionised project management for sustained growth.

Get started with your free 14-day trial

See what WorkGuru can do for your business. No credit card required, no lock-in, cancel anytime.