Home / Industries / Pipework and Ducting

For pipework and ducting fabricators

Job Management Software for Pipework & Ducting

Keep fabrication and site installation tied back to the same quote, hours, materials and changes.

  • Local support, based in Brisbane
  • Built for pipework and ducting
  • No lock-in contract

The reality

What fits on the drawing does not always fit on site.

No two jobs are exactly the same, but a few problems come up again and again.

Site dimensions change.

A run that looked simple needs another offset, spool or section.

Workshop and site both touch the same job.

Hours can disappear if they are not kept together.

Materials add up quickly.

Sheet, pipe, fittings, flanges, insulation, freight and outside work all matter.

One missing piece can stop an install.

You do not want the crew standing around because one spool or fitting is not ready.

Rework happens.

A measurement, drawing or site change can send work back through the shop.

Variations happen in small pieces.

A few changes across a job can become a lot of unpaid work.

How it runs

Keep the job together from start to finish.

Same job record from the first quote through to the invoice. Nothing gets re-entered and nothing gets left in someone’s head.

01

Quote it

02

Plan the job

03

Order material

04

Fabricate it

05

Deliver to site

06

Install it

07

Capture changes

08

Invoice it

Proof

What it looks like in a real workshop

We are adding stories from pipework and ducting fabricators. In the meantime, see how workshops like yours run WorkGuru.

Why pipework and ducting fabricators choose WorkGuru

Know what is going on with the job.

Pipework and ducting jobs bounce between drawings, workshop and site. WorkGuru keeps the labour, purchases and changes on the same job so you can see the whole thing.

What still needs making?

See what is ready, underway and outstanding.

Where are the hours going?

Keep shop and site labour on the same job.

Do we have the material?

Keep purchases tied to the work.

What changed on site?

Keep variations with the job.

How did the job actually go?

Compare the quote with the real hours and costs.

The tools you will actually use

Key features pipework and ducting fabricators use

Every one of these has its own page. Follow the link if you want the detail on how it works.

Quoting / Estimating

Put down what you expect the job to need before you start.

Jobs

Keep the important information about the job together.

Scheduling

See what is coming up, what is underway and what is waiting.

Timesheets

Get the team’s hours onto the jobs they actually worked on.

Purchasing

Keep what you buy against the job it was for.

Job Costing

See what you allowed for and what the job is actually costing.

Automations

Handle the reminders, approvals and handovers that are easy to forget when things get busy.

Reporting

Look back at jobs and see what actually happened.

Fit

Will it work for the way we do jobs?

Fair question. Every business does things a little differently. These are the questions that usually matter most.

“We fabricate and install.”

That is fine. Keep both parts on one job if that is how you run it.

“Site changes are constant.”

Keep the changes and extra work against the job as they happen.

“We do lots of small sections and packages.”

Use the job detail you need without making every piece complicated.

“We already use drawing software.”

Keep it. WorkGuru is there for the job, hours, purchasing and costs.

Where it pays off

What pipework and ducting fabricators use WorkGuru to fix

Each of these is a job to be done rather than a feature. The chips show the parts of WorkGuru doing the work.

Job Profitability

Know what the job actually made, not what the quote said it would.

Workshop Visibility

Know what is on the floor, what is waiting, and what is holding things up.

Workshop Scheduling

Put work in front of the right people in the right order, and move it when things change.

Labour Cost Tracking

See the hours that went on each job, and what those hours cost you.

Project Purchasing

Keep supplier orders and bought-in parts against the job they belong to.

Faster Invoicing

Invoice off what was recorded on the job, so nothing gets missed and nothing sits waiting.

Integrations

Keep using the systems you already have.

You do not need to replace your accounting or ERP system just to get the jobs under control. WorkGuru handles the job side – quoting, scheduling, timesheets, purchasing and job costs – and connects with the other systems you use.

FAQs

Questions pipework and ducting fabricators ask

“We fabricate and install. Should that be one job or two?”

One job, in most cases, with separate tasks for shop and site. The client contracted for an installed system, and splitting it into two projects makes the commercial result unreadable — you end up with a profitable fabrication job and a loss-making install and no way to tell whether the package was ever priced properly. Tasks give you the internal split without breaking the job. The exception is genuine supply-only work, which is a different commercial arrangement and belongs on its own job.

“Can we track spool fabrication against the job?”

Yes, by structuring the job so fabrication is broken into the tasks that match how you actually work — cutting, fitting, welding, testing. On pipework this granularity earns its place because the labour content is concentrated in welding and the welding content varies enormously with material, diameter and position. A job costed as a single fabrication figure cannot tell you whether the stainless package was underpriced while the carbon steel carried it.

“How do we handle weld testing, NDT and inspection?”

Testing performed externally goes on as a project purchase; internal inspection time records as a task. Both belong on the job, and on pipework the testing regime is frequently specified rather than chosen, which makes it a cost you inherit from the contract rather than control. Recording it against the project is how you find out what a particular client’s inspection requirements actually cost you to satisfy — useful information the next time they tender the same specification.

“Can we keep material traceability records with the job?”

Material certificates, heat numbers and test records attach to the project as documents, which keeps them with the work they relate to. Be clear on the boundary, though: WorkGuru gives you a place to hold that documentation against the job, not a formal traceability system that enforces certificate-to-spool linkage. Fabricators working to a standard that requires auditable traceability normally maintain that discipline in a dedicated quality system.

“Site changes are constant. How is that handled?”

Changes record against the job as they occur — additional spools, re-routes, extra supports, the hours to modify work already fabricated. Pipework and ducting sit late in the construction sequence, which means you absorb the accumulated variation of every trade ahead of you: a duct run that no longer fits because the structure moved is your rework and someone else’s error. Capturing it as it happens is what turns that into a claim rather than a cost.

“Can we manage pressure testing and commissioning?”

Yes, as tasks with their own time and cost. Testing is the stage where pipework projects most often lose their remaining margin, because a failed test means finding the fault, cutting out, re-welding, re-testing and doing it while the programme is already late. Costing it separately across projects tells you whether your test allowance is realistic, and it usually tells you something uncomfortable about first- time pass rates on particular jobs or crews.

“Can we handle supply-and-install alongside labour-only contracts?”

Yes, and they need to be read differently. On supply-and-install the material and fabrication content dominates. On labour-only the entire result is your hours against a rate, which makes productivity and standing time the only variables that matter. Running both through the same system is fine as long as you resist comparing their margins directly — a labour-only job at twelve per cent may be a better outcome than a supply-and-install job at twenty.

“Can we plan around fabrication bays and welding stations?”

Yes. Work Areas can represent bays, welding stations, the rolling machine or the test bay. On pipework the constraint is often qualified welders rather than physical space — a coded weld needs a specific ticket — which is a capacity problem a bay-based schedule will not show you on its own. Structure it around whichever resource genuinely limits you, and be honest about which that is.

“Can we see whether the site or the shop lost the money?”

Yes, provided you kept shop and site as separate tasks on the job. This is the single most useful comparison in the trade, because the two are managed by different people and the assumption in most businesses is that the shop is efficient and the site is chaotic. Sometimes that is right. Frequently the shop is producing spools that do not fit, and the site hours are the symptom rather than the cause.

“Does WorkGuru replace our drawing or isometric software?”

No. Your drawing package produces the isometrics and spool drawings; WorkGuru handles the job, the labour, the purchasing, the testing costs and the commercial result. The handover is the spool list and the material take-off. What WorkGuru adds is what happened to those spools in practice — the hours they took, the rework they needed and whether the package was worth tendering.

See how WorkGuru would work for your pipework and ducting business.

We will show you how WorkGuru handles the jobs, and you can decide if it fits the way you work.