Job Management Software for Fabricators
Keep every fabrication job under control from quote to invoice, with the costs, labour, materials and progress visible as the job moves through the shop.
- Local support, based in Brisbane
- Built for fabrication shops
- No lock-in contract

The reality
Different jobs. Familiar challenges.
Every shop runs a little differently, but the same things tend to trip jobs up. More hours than expected. A material change. A drawing revision. A rush job in the middle of the week.
The job took longer than you allowed for.
You quoted 80 hours. It took 110. A couple of extra hours here and there did not look like much until the job was done.
Materials cost more than expected.
Prices changed, more material was needed, or something was missed in the original quote.
The job changed after you started it.
A drawing changed. The customer added something. Something unexpected came up on the floor.
A rush job jumps the queue.
The plan for the week changes because something urgent lands in the shop.
Outside work holds the job up.
Galvanising, powder coat, machining or another subcontractor is not ready when you expected.
The job is done, but the numbers are not.
Hours, purchases and extras still need to be pulled together before you really know how it went.
How it runs
Keep the job together from start to finish.
Same job record from the first quote through to the invoice. Nothing gets re-entered and nothing gets left in someone’s head.
01
Quote it
02
Turn it into a job
03
Plan the work
04
Order what you need
05
Get the job done
06
Record the hours
07
Keep an eye on costs
08
Invoice it
Proof
What it looks like in a real workshop
We are adding stories from fabricators. In the meantime, see how workshops like yours run WorkGuru.
Why fabricators choose WorkGuru
Know what is going on with the job.
When you have a shop full of jobs, keeping track of all of them gets hard quickly. WorkGuru keeps the quote, hours, materials, purchases and changes with the job, so you can see where it is at and what it is costing while it is still going.
How many hours have we used?
See what you allowed for and what has actually gone onto the job.
Are the materials here?
See what has been ordered and what the job is still waiting on.
Did we capture that change?
Keep extras and changes with the job as they happen.
What is holding this job up?
See what is moving, what is waiting and what is running late.
Did we actually make money on it?
Compare what you quoted with what the job really took.
The tools you will actually use
Key features fabricators use
Every one of these has its own page. Follow the link if you want the detail on how it works.
Quoting / Estimating
Put down what you expect the job to need before you start.
Jobs
Keep the important information about the job together.
Scheduling
See what is coming up, what is underway and what is waiting.
Timesheets
Get the team’s hours onto the jobs they actually worked on.
Purchasing
Keep what you buy against the job it was for.
Job Costing
See what you allowed for and what the job is actually costing.
Automations
Handle the reminders, approvals and handovers that are easy to forget when things get busy.
Reporting
Look back at jobs and see what actually happened.
Fit
Will it work for the way we do jobs?
Fair question. Every business does things a little differently. These are the questions that usually matter most.
“But we are a custom fabricator.”
That is fine. WorkGuru does not need every job to look the same.
“Our jobs change once they hit the floor.”
That is normal. Keep the changes, extra hours and extra costs on the same job.
“We do small jobs and big projects.”
A quick job can stay simple. A bigger project can carry more tasks, purchases and detail.
“The workshop will not live in software.”
They should not have to. They need the job information, a simple way to record time, then they can get back to it.
Where it pays off
What fabricators use WorkGuru to fix
Each of these is a job to be done rather than a feature. The chips show the parts of WorkGuru doing the work.
Job Visibility
See where every job is up to without walking the floor or chasing someone for an update.
Powered by:
Job Cost Control
Watch costs against the quote while the job is still running, not after it has been invoiced.
Powered by:
Labour Cost Tracking
See the hours that went on each job, and what those hours cost you.
Powered by:
Workshop Scheduling
Put work in front of the right people in the right order, and move it when things change.
Powered by:
Project Purchasing
Keep supplier orders and bought-in parts against the job they belong to.
Powered by:
Integrations
Keep using the systems you already have.
You do not need to replace your accounting or ERP system just to get the jobs under control. WorkGuru handles the job side – quoting, scheduling, timesheets, purchasing and job costs – and connects with the other systems you use.
FAQs
Questions fabricators ask
Can WorkGuru handle custom fabrication where no two jobs are the same?
Yes, and that is the case it is built for. A fabrication job in WorkGuru starts as a quote and becomes a project that carries its own tasks, materials, labour and purchases. Nothing forces the job to match a previous one. Where work does repeat — a standard bracket run, a common assembly — a project template gives you the structure to start from, and you change what needs changing on the individual job. The practical effect is that your quick one-day jobs stay quick to set up, while a twelve-week structural package can carry the detail it needs, without running two different systems to do it.
Can we see what a job actually cost, not what we thought it would cost?
Yes. This is the point of job costing. Labour recorded through timesheets, materials issued from stock, purchase orders raised against the project and subcontract or outside-process costs all land on the same job. You compare that running total against what you allowed for in the quote. The number that matters is usually not the final margin but the gap you can see at week three, while there is still time to do something about it. Most fabricators find the first surprise is not material cost. It is the hours going into rework and fit-up that never appeared on any estimate.
How do we handle galvanising, powder coating and other outside processes?
Raise them as purchases against the job. Outside processing is bought work, and treating it as a project purchase keeps the cost attached to the fabrication it belongs to rather than disappearing into a general overhead account. You get the supplier cost, the job it was for and the timing in one place. The timing matters as much as the cost: a coater holding your steel for nine days is a scheduling fact, not just an invoice, and keeping the purchase on the job is what makes that visible when you are planning the next fortnight.
Our jobs change once they hit the floor. Does that break the costing?
No, and this is where keeping the change on the same job pays for itself. Extra hours, extra material and additional purchases go onto the project as they happen. The original allowance stays visible, so at any point you can see the job as quoted against the job as it is being built. The failure mode this prevents is the common one: the shop absorbs three days of unquoted modification, nobody writes it down, and the variation never reaches the invoice. Recording it does not make the customer pay for it, but it does mean the conversation is possible.
Can workshop and site hours go to the same job?
Yes. Time is recorded against the project or the task, not against a location, so fabrication hours and site installation hours accumulate on the same job. That is usually what you want, because the commercial result of a supply-and-install job is the two together. If you need to see them apart — and most fabricators who install do — structure the job with separate tasks for shop and site, and the split reports itself without needing two projects.
Can we plan work around the bays, machines and bottlenecks in our shop?
Yes. Work Areas represent the constrained parts of your shop — a bay, a press, a welding cell, the paint booth — and work is scheduled against them. The value is not the picture of a full week. It is seeing that everything you have committed to converges on one resource in week three, before you promise a delivery date that depends on it. Most shops already know which resource is the bottleneck. What they usually cannot see is how many current promises quietly depend on it.
Do we still need our estimating or nesting software?
Yes, keep it. WorkGuru does not nest, does not drive machines and does not replace detailing or CAD. It runs the commercial and operational job around that work: the quote, the project, the labour, the purchasing, the costs and the invoice. The sensible division is that your technical software decides how the part gets made and WorkGuru tracks what making it cost you and whether the job was worth taking.
Does WorkGuru replace our accounting system?
No, and it is not trying to. WorkGuru runs the operational side — the jobs, the labour, the purchasing, the stock and the job costing — and connects to your accounting system like XERO and MYOB, so invoices and bills flow through to the ledger. Your accountant keeps the system they know. What changes is that the job-level detail behind the numbers lives somewhere that the workshop can actually see, instead of only becoming visible a month later in a P&L that cannot tell you which job lost the money.
Is WorkGuru worth it for a small shop?
It depends on where your problem is. If you are three people and every job is a day long, a whiteboard and a decent invoicing tool may genuinely be enough. WorkGuru starts earning its place when jobs run long enough to lose track of, when more than one person is buying material, or when you have stopped being able to tell which jobs are actually making money. The question worth asking is not how many staff you have. It is whether you could say, right now, which of your last ten jobs made money and which did not.
See how WorkGuru would work for your fabrication business.
We will show you how WorkGuru handles the jobs, and you can decide if it fits the way you work.