Home / Industries / Electrical Contractors
For electrical contractors
Job Management Software for Electrical Contractors
Keep commercial electrical jobs tied to the labour, materials, equipment, variations and site work that actually went into them.
- Local support, based in Brisbane
- Built for electrical contractors
- No lock-in contract

The reality
Commercial electrical work is a lot more than sending a sparky to a call-out.
No two jobs are exactly the same, but a few problems come up again and again.
The program moves.
You are ready for rough-in but the site is not.
Materials add up fast.
Cable, tray, switchgear, fittings and bought-in equipment all matter.
Changes happen on site.
Another circuit, another run, another board change. It needs to stay with the job.
Crews move between projects.
The hours need to land on the right job, even when people move around.
Long-lead gear can hold everything up.
One switchboard or piece of equipment can set the whole date.
The job is finished but the variation list is still open.
That is where money gets left behind.
How it runs
Keep the job together from start to finish.
Same job record from the first quote through to the invoice. Nothing gets re-entered and nothing gets left in someone’s head.
01
Quote the job
02
Order key equipment
03
Plan the crew
04
Start the install
05
Record labour and material
06
Capture changes
07
Test and finish
08
Invoice it
Proof
What it looks like in a real workshop
We are adding stories from electrical contractors. In the meantime, see how workshops like yours run WorkGuru.
Why electrical contractors choose WorkGuru
Know what is going on with the job.
Commercial electrical jobs have crews, material, equipment and changes spread across a site. WorkGuru keeps the job costs together so you can see what is happening before final account time.
Where are the hours going?
Get crew time onto the right jobs.
What gear are we still waiting on?
See purchasing against the project.
Did we capture the variation?
Keep site changes with the job.
What is holding us up?
See whether the issue is site, material or labour.
How did the project actually go?
Compare the quote with the real cost.
The tools you will actually use
Key features electrical contractors use
Every one of these has its own page. Follow the link if you want the detail on how it works.
Quoting / Estimating
Put down what you expect the job to need before you start.
Jobs
Keep the important information about the job together.
Scheduling
See what is coming up, what is underway and what is waiting.
Timesheets
Get the team’s hours onto the jobs they actually worked on.
Purchasing
Keep what you buy against the job it was for.
Job Costing
See what you allowed for and what the job is actually costing.
Automations
Handle the reminders, approvals and handovers that are easy to forget when things get busy.
Reporting
Look back at jobs and see what actually happened.
Fit
Will it work for the way we do jobs?
Fair question. Every business does things a little differently. These are the questions that usually matter most.
“We are commercial, not residential service. Is this aimed at us?”
Yes. Residential service electrical is dispatch work — many short jobs, a van, a scheduling problem. Commercial electrical contracting is project work with a tendered scope, significant material procurement, crews on site for weeks, variations and testing obligations at the end. The commercial exposure sits in procurement and variations rather than in scheduling density, and that is what this is built around. If your business is mostly service calls, a field-service platform is the better primary system.
“Can we manage cable, switchgear and fittings procurement against the job?”
Yes, through project purchasing. On commercial electrical the material content is large and price-volatile, particularly cable, and the gap between tender price and purchase price can consume the margin on its own. Keeping purchases on the job means you can see that happening within the project rather than at the end of the year. It also gives you an evidenced position when a client disputes a rise-and-fall claim, which is difficult to argue from a supplier statement.
“Can we track prelim and site establishment costs?”
Yes, as tasks and purchases on the job. Prelims are the costs most often waved through at tender — site sheds, temporary supply, scaffolding, inductions, site management time — and the most often exceeded, because they scale with duration rather than with scope. A project that runs six weeks over does not just cost six weeks of labour, it costs six more weeks of everything that was priced against the programme. Costing prelims separately is how that becomes visible.
“How do we handle testing, certification and compliance paperwork?”
Testing and commissioning can be structured as tasks so the time is recorded, and certificates, test results and compliance documentation attach to the project. The value at completion is having the certification package assembled as you went rather than reconstructed at handover, which on commercial jobs is frequently a precondition of the final claim.
“Can we keep subcontractor costs on the same job?”
Yes, as project purchases. Data cabling, security, fire, and specialist installation subcontractors record on the job alongside your own crews. Most commercial electrical contractors subcontract the packages that carry their own licensing or specialisation, and those packages have a habit of being priced once at tender and never checked against what they actually cost. Having them on the job puts that comparison in front of you.
“Can we manage variations on site?”
Yes, and volume is the problem here rather than complexity. Commercial electrical generates a steady stream of small variations — an extra GPO, a relocated light, a changed switchboard schedule — each individually trivial and collectively significant. They are absorbed because writing each one up feels disproportionate to its size. If the recording happens on the job as the work is done, the aggregate becomes visible, and the aggregate is what is worth claiming.
“Can crews record time from site?”
Yes, against the job or task they are working on. On commercial electrical the allocation matters more than the total, because crews frequently move between levels, stages or even projects in a week, and time booked to the wrong job quietly makes one project look profitable and another look bad. Neither number is then usable. Recording against the actual job as the day goes is what keeps the whole set honest.
“Can we see whether a project is over before it finishes?”
Yes. Labour, materials and subcontract costs accumulate against the allowance throughout. On a long commercial job the useful signal is normally labour productivity rather than material price — material is largely committed early and known, while labour drifts — so watching hours against the stage they belong to will give you earlier warning than watching the total. The total is a lagging indicator on electrical work for a specific reason: material is drawn down early and shows as spend long before the corresponding labour is done, which makes a healthy project look alarming at month two and a troubled one look fine at month five. Stage-level hours against stage-level allowance is the comparison that behaves sensibly throughout.
“Can we use templates for repeat project types?”
Yes. Contractors doing recurring work — retail rollouts, tenancy fitouts, standard switchboard packages — can start from a template built on what the last ones cost. Beyond speed, this gives you a defensible baseline: when a client asks why this store costs more than the last, an answer grounded in the actual cost of the last eight is considerably stronger than a revised estimate.
Where it pays off
What electrical contractors use WorkGuru to fix
Each of these is a job to be done rather than a feature. The chips show the parts of WorkGuru doing the work.
Job Visibility
See where every job is up to without walking the floor or chasing someone for an update.
Powered by:
Labour Cost Tracking
See the hours that went on each job, and what those hours cost you.
Powered by:
Job Cost Control
Watch costs against the quote while the job is still running, not after it has been invoiced.
Powered by:
Project Purchasing
Keep supplier orders and bought-in parts against the job they belong to.
Powered by:
Quoting & Estimating
Price work off what jobs like it actually took, and get the quote back out the same day.
Powered by:
Faster Invoicing
Invoice off what was recorded on the job, so nothing gets missed and nothing sits waiting.
Powered by:
Integrations
Keep using the systems you already have.
You do not need to replace your accounting or ERP system just to get the jobs under control. WorkGuru handles the job side – quoting, scheduling, timesheets, purchasing and job costs – and connects with the other systems you use.
FAQs
Questions electrical contractors ask
Can WorkGuru handle different types of electrical job?
Yes. Jobs do not all need to look the same. Keep the quick ones simple and add more detail where a bigger job needs it.
Can we track hours against each job?
Yes. Time can be recorded against the job so you can see what the team actually used.
Can we keep purchases and parts against the job?
Yes. Purchases can stay with the job they were for, so the real cost is easier to see.
Can we see when a job is starting to blow out?
Yes. Compare what is actually going onto the job with what you originally allowed for while the job is still going.
What if the job changes after we start?
That is normal in job-based work. Keep the extra hours, parts, materials and changes with the same job.
Does WorkGuru replace our accounting software?
No. WorkGuru handles the jobs and works alongside your accounting or financial system.
See how WorkGuru would work for your electrical contracting business.
We will show you how WorkGuru handles the jobs, and you can decide if it fits the way you work.